Mansfield Community Diagnostics Centre

Home | Projects | Mansfield Community Diagnostics Centre
  • ___

    Client

Kier Construction

  • ___

    Location

Mansfield

  • ___

    Completion Date

2025

  • ___

    Expertise Used

Steel Frame Systems (SFS), Dry Lining, Suspended Ceilings, Plastering

  • ___

    Products Used

GO Interiors were used to supply the Siniat Weather Defence boards used for the external walls and CCF supplied British Gypsum plasterboards and metal used to create the internal partitions. Suspended ceilings were installed using Rockfon materials which were supplied by SIG.

At the end of 2024, we partnered with Kier Construction to deliver the SFS, internal partitions and ceilings in the new Community Diagnostic Centre (CDC) at Mansfield Community Hospital, along with the full refurbishment of the adjacent block.

This purpose-built facility will enable patients to access the tests and investigations they need in a single visit, helping to speed up referral’s and support quicker diagnoses or ‘all clear’ outcomes.

As Nottinghamshire’s first dedicated CDC, it is set up to provide around 130,000 additional diagnostic tests each year – a major boost for local healthcare capacity!

We were thrilled to recieve personal thanks from Project Manager, Daniel Manlove, recognising our team’s hard work and contribution to achieve an excellent air test result of 1.2!

It’s certainly a project we’re proud to have been a part of!