Client
Kier Construction
Location
Mansfield
Completion Date
2025
Expertise Used
Steel Frame Systems (SFS), Dry Lining, Suspended Ceilings, Plastering
Products Used
GO Interiors were used to supply the Siniat Weather Defence boards used for the external walls and CCF supplied British Gypsum plasterboards and metal used to create the internal partitions. Suspended ceilings were installed using Rockfon materials which were supplied by SIG.
At the end of 2024, we partnered with Kier Construction to deliver the SFS, internal partitions and ceilings in the new Community Diagnostic Centre (CDC) at Mansfield Community Hospital, along with the full refurbishment of the adjacent block.
This purpose-built facility will enable patients to access the tests and investigations they need in a single visit, helping to speed up referral’s and support quicker diagnoses or ‘all clear’ outcomes.
As Nottinghamshire’s first dedicated CDC, it is set up to provide around 130,000 additional diagnostic tests each year – a major boost for local healthcare capacity!
We were thrilled to recieve personal thanks from Project Manager, Daniel Manlove, recognising our team’s hard work and contribution to achieve an excellent air test result of 1.2!
It’s certainly a project we’re proud to have been a part of!